Overtime, water shed from the fairway has eroded the corner of the lake to the point it had to be reconstructed. Step one was to build up the original edge and fill the bottom of the cavity with rip rap. The next step was to add dirt then pack to grade. Following the dirt, the area was sodded.
Prior to work being performed |
Rock added
Prior to sodding
|