Monthly Goals


January 2014

  • Apply pre and post emergent herbicides to the course, tennis, aquatics and the clubhouse. 139 acres will be treated in all
  • Repair crushed drainage pipe on #3 (right rough)
  • Install drainage in the back half of the driving range weather permitting
  • Remove low hanging limbs on all trees #1 foward
  • Cover greens at 22 degrees or below