Each side of the spillway had undermined, allowing water to bypass. We lowered the water level a couple of feet, then used 25 bags of concrete to fill the holes. After one or two good rainfalls, it should return to its normal level. Below are pictures of each side.
Friday, May 17, 2013
Tuesday, May 7, 2013
Why do we aerify greens?
Below is a link to a video on the importance of greens aerification.
Greens Aerification the by the USGA
Tuesday, March 26, 2013
Lake Bank Repair #2
Overtime, water shed from the fairway has eroded the corner of the lake to the point it had to be reconstructed. Step one was to build up the original edge and fill the bottom of the cavity with rip rap. The next step was to add dirt then pack to grade. Following the dirt, the area was sodded.
![]() Prior to work being performed |
Rock added
Prior to sodding |
Monday, February 25, 2013
Irrigation Addition
Tuesday, November 27, 2012
#15 Creek Work
Work began on 11/5 reshaping the creek that had eroded dangerously close to the cart path. Our contractor spent 7 days excavating, installing a larger pipe, and adding 10 truck loads or 270 tons of rock. Once he was finished our staff prepped and sodded the work site. Below are before, during and after pics.
![]() |
Before![]() Banks being sloped Rock being added Finishing touches |
Monday, November 5, 2012
Bunker Sand Additions
Over the past couple of years the sand depths had become critically low. Without enough sand it is extremely difficult to maintain playable and maintenance friendly bunkers. Although we hand rake bunkers on a daily bases, following heavy rain events it is necessary to use the bunker machine to repair them. During this process a push blade and plow is used to redistribute sand. If sand levels are low the machine grabs and tears the fabric lining the bottom.
Last month 8 truck loads or 205 tons of sand were added. Our goal of filling them to proper levels has been accomplished. Remember that it will take several months for the sand to settle. During this time you will see an increase in plugged balls.
Last month 8 truck loads or 205 tons of sand were added. Our goal of filling them to proper levels has been accomplished. Remember that it will take several months for the sand to settle. During this time you will see an increase in plugged balls.
Tuesday, August 21, 2012
Cart Path Update
Broken sections of cart path on #"s 11,12,13,16 and 18 have been replaced. The total area is 2500 sq ft or 312 linear ft of path. Below are a couple of pictures before and after on #13. Thanks again for your patience.
Before
After
Subscribe to: