Tuesday, July 16, 2013

Aerification 2013

We began aerifying greens yesterday following the Jr. tourney.It will take several more days to complete the process, then we will do all over again next week. I'll provide an update with picture and details later in the week.

Tuesday, June 18, 2013

Course Pictures

This past week seemed like the perfect time to take some course photos. I wanted to take this time to thank the staff for an incredible job in preparing the course for your enjoyment.

#2


 #3



#4


 
#5



#6



#8



#11



#12

Thursday, May 23, 2013

Severe Storm Damage

                Around 4:00 pm yesterday, a small but very strong storm passed over the course. High winds (60mph) and very heavy rain caused bunkers to wash, scattered large amounts of debris and downed 4 trees. Today all of our resources will be used blowing greens and removing debris. Once these items are completed we will be able to concentrate on playability. This process could take through the weekend before the course is back to normal. Check back over the next two days for updates.


#5

#9


#10


#16


#16


#17


Friday, May 17, 2013

Spillway Repair #9

Each side of the spillway had undermined, allowing water to bypass. We lowered the water level a couple of feet, then used 25 bags of concrete to fill the holes. After one or two good rainfalls, it should return to its normal level. Below are pictures of each side.




Tuesday, March 26, 2013

Lake Bank Repair #2

Overtime, water shed from the fairway has eroded the corner of the lake to the point it had to be reconstructed. Step one was to build up the original edge and fill the bottom of the cavity with rip rap. The next step was to add dirt then pack to grade. Following the dirt, the area was sodded.




Prior to work being performed 



 Rock added



Prior to sodding





Monday, February 25, 2013

Irrigation Addition

Two heads were added to the left side of #2, providing water to an additional 21,000 square feet of turf. Below are a few pictures of the process.


Hole where tap was made



Holes being dug for heads



Pipe installation



Area in fwy repaired



One of the two heads installed